Project Information

Project List
     

 
For additional project information or assistance, please contact: Andrea Hawkins  Email Me - ph: (217)352-7408 

Champaign 2019 Infrastructure Maintenance
Project Number: 0180868.00

Client: City of Champaign

Location: Champaign, IL    

Description: Project No. 1 - Brick Rehabilitation: Brick pavers will be replaced or reset to correct tripping hazards and settlement areas. The work will be performed in One Main Plaza in the northeast corner of the Neil Street & Church Street intersection from the plaza parking lot to the edge of pavement along Church Street.

Project No. 2 - Sidewalk Gap: Sidewalk will be installed along Bloomington Road, west of Hagan Street, on the south side of the street and along Hagan Street, north of Bloomington Road, on the east side of the street. Entrances will be removed and reconstructed as
necessary.

Project No. 3 - Annual Bridge Maintenance: Repairs to bridge on Devonshire Drive between Prospect Avenue and Fox Drive.

Project No. 4 - Street Lighting Improvements: New light poles will be installed along Curtis Road between I-57 interchange and Fields South Drive.

Estimate: Not Available

Bid Date/Time: 21-MAR-2019, 10:00 AM CST
Bid Location: City of Champaign’s Council Chambers
102 North Neil Street
Champaign, IL 61820

Project Manager: Joe Grimm, PE

Project Contact: Joe Grimm, PE  (jgrimm@f-w.com)

Add'l Information:Must be pre-qualified by City of Champaign to bid on this project


 

 
Plan Holders List is Updated Daily by 10:00am CST

 


Download Project Documents

This Project Requires Bidders to be Prequalified
prior to gaining access to Project Documents



The Bid Date for this Project has passed.
We are no longer accepting requests
for access to this project.
 
Please contact BidList@f-w.com if you
believe this access restriction is in error.
Thank You!


Download Adobe Reader

 

 

 
® 2019 Farnsworth Group www.f-w.com info@f-w.com