Major rehabilitation, repair, and new improvements at the Owner’s Southeast Wastewater Treatment Plant. Existing wastewater plant infrastructure expansion, rehabilitation, and repair will include, but not be limited to work in the Headworks building (screw pump rebuild, mechanical screen rebuild), Primary Influent Lift Station (pump rebuild), secondary treatment system (three new anaerobic selectors, new anoxic and aeration basin, new equipment), Sludge Pump/Blower Building (new aeration blowers and WAS holding basin blowers, RAS pump replacement), Tertiary Filter Building (replacement of tertiary filtration equipment and UV equipment), and Residuals Building (new dewatering screw press, cake conveyor system rehabilitation). The project includes three new buildings: Inventory Building, Chemical Feed Building, and Aeration Basin Electrical Building. The Project generally incorporates improvements to site grading and piping, electrical, controls, architecture, mechanical and plumbing.
Estimate:
Not Available
Pre-Bid Date/Time:
02-NOV-2023, 11:00 a.m. CST
Pre-Bid Location:
West Wastewater Treatment Plant Board Room
2015 West Oakland Avenue
Bloomington, IL 61701
Bid Date/Time:
01-DEC-2023, 2:00 p.m. CST
Bid Location:
West Wastewater Treatment Plant
2015 West Oakland Avenue
Bloomington, IL 61701
Pre-bid conference is mandatory and will be followed by a guided tour of the Southeast Wastewater Treatment Plant. Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference.