Active Project List

Project List


Project Access Requests can be submitted up to the Project Bid Date
Projects which are highlighted have already been bid - Project Information will only be listed for 30 days after the Bid Date

Project Number Client Name - Project Name - Description Location Bid Date

0230222.00 Danville Sanitary District - Administrative Building Renovation
Design, bidding assistance, and CA for an interior office renovation at the Danville Sanitary District Administration Building.  The project also includes window replacement.
Danville, Illinois 30-JUL-2024

0240219.000 Fisher CUSD #1 - Access Control Upgrades
Fisher CUSD No. 1 is inviting sealed Bid Proposals from interested and qualified parties for Grade School and Jr./Sr High School Access Upgrades.
Fisher, IL 06-AUG-2024

0221558.00 City of Danville - Dines Machine & Manufacturing Relocation
This project consists of building alteration work required to relocate and install existing machinery and equipment from Dines Machine Shop's existing facility at 1120 Industrial Street in Danville, IL. To a new facility located at 2003 East Voorhees Street in Danville, IL. The scope of work includes, but is not limited to HVAC, electrical and plumbing work, structural repairs, partial roof replacement and office renovation work at the new facility, as outlined in the associated construction documents. Site work includes but is not limited to infilling an existing loading dock and installing a new concrete loading pad. This work shall include all labor, supervision, coordination, materials, transportation, and services necessary and required to perform the Dines Machine and Manufacturing Relocation Project.
Danville, IL 08-AUG-2024

0240829.00 City of Newman - Newman Shute St. and Hopkins St. Water Main
The work generally consists of furnishing and installation of water system piping, fittings, valves,
hydrants, services, connections, disconnections, and appurtenances for potable water. Installation
will consist of 4” PVC SDR-21 Water Main and 4” PVC R.J. HDD along design route. This work also
includes surface restoration with various pavements, curbing, and sidewalk. The work shall include all
labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents.
City of Newman 12-AUG-2024

024MUN0222.00(h) City of Calumet City - 2024 Water Tank Exterior Cleaning
The City of Calumet City is seeking contractor proposals to perform exterior cleaning on four (4) water tanks at three different locations. The first tank is the pink elevated water tank located at 1680 Dolton Road. The second tank is the yellow elevated water tank located at 96 River Oaks Center Drive. The last two tanks are above ground water storage tanks located at 945 State Street.
Calumet City, IL 15-AUG-2024

0231281.00 City of Monticello Parks and Recreation Department - PFC Robert C. Burke - Memorial Park
The Work of this Project is defined by the Contract Documents and consists of the following:
1. Selective demolition.
2. Architectural construction including picnic shelter installation with electrical components.
3. Site work to include excavation, earthwork, asphalt pavement, concrete pavement, sidewalk, pads & curb, stormwater, water, and electrical utilities, basketball and tennis/pickleball court construction, fencing, playground site preparation, landscaping, site amenities, and additional necessary work as defined by the Contract Documents.
4.Contractor shall be required to coordinate and provide equipment for off-loading of owner-purchased playground equipment when it arrives to the project site.
Monticello, IL 15-AUG-2024

0231290.00 University of Illinois - UIUC Mathews Avenue Lift Station
The project is located on the east side of Mathews Avenue, about 375 feet north of W. Green Street in Champaign, Illinois. The work included in the base bid governed by these specifications shall include all labor, materials, equipment, transportation, and the performance of all operations necessary to satisfactorily complete the site work improvements as shown on the Drawings. This project will remove the existing pumps, valving and piping and replace with new 2000 gpm submersible pumps, valving, and piping in the lift station.
Mathews Ave. lift station - east side of Mathews between Green St. and Springfield Ave, near the Boneyard Creek. 03-SEP-2024

0230217.00 Village of Atwood - Atwood WWTP Upgrade
Division A: Wastewater Treatment Plant Improvements
The projects generally consist of rehabilitation, upgrades, and general improvements at the existing wastewater treatment plant. The project involves installation of a new influent fine screen, upgrades to the plants aeration system including blowers and air piping. A new storage shed will be constructed near the existing plant building to house the new blowers. Other miscellaneous work includes but not limited to, construction of a concrete pad for the influent screen, and construction of a concrete walkway. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents.
Division B: Sanitary Sewer Rehabilitation
The project involves sewer lining by Curing in Place Pipe (CIPP) Lining. The Bid for the CIPP Trunk Sewer Lining encompasses but not limited to approximately 3,370 LF of 10-12” Sanitary Sewers, Mobilization, Demobilization, Cleaning, Televising, Bypass Pumping, Traffic Control, Point Repairs, Surface Restoration, and Incidentals. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents.
Village of Atwood 06-SEP-2024


 
 
®